advisory fee from the inventory shortfall and the maintenance expenses from a major shutdown of methyl ester plant 1, investigating and repairing plant’s equipment of methyl ester plant 2 and three times
progress which is on process of finalisation of equipment specification and layout designing. The project has the scheduled COD by September 2020. Sisophon, solar project in Cambodia, with an installed
periods Variance 2/2017 1/2017 (%QoQ) 2/2016 (%YoY) 2017 2016 (%YoY) Employees' expenses 349.6 351.6 (0.6) 326.9 6.9 701.2 643.9 8.9 Premises and equipment expenses 185.1 182.3 1.5 176.8 4.7 367.4 348.3 5.5
% Trade accounts receivable 33,352 31,085 7% Inventories 41,088 40,459 2% Other current assets 9,336 8,811 6% Total current assets 89,032 84,495 5% Investment 6,380 5,530 15% Property, plant and equipment
return. The share premium will be the asset of Hero Experience for construction cost and investment in the project. The main expenses are; 1. Construction, equipment and software system for approximately
expenses are; 1. Construction, equipment and software system for approximately Baht 500,000,000 2. Other expenses during operation for approximately Baht 80,000,000 3. Working capital for operation for
sale and convertible bond. The immovable property for investment unchanged, the part of building and equipment was increased Baht 1.54 million. Intangible assets-net was decreased Baht 0.40 million
8,199 8,811 (7)% Total current assets 86,145 84,495 2% Investment 6,340 5,530 15% Property, plant and equipment 145,109 136,860 6% Intangible assets 27,960 27,257 3% Deferred tax assets 2,658 2,233 19
84,495 10% Investment 6,247 5,530 13% Property, plant and equipment 151,202 136,860 10% Intangible assets 27,865 27,257 2% Deferred tax assets 2,620 2,233 17% Other assets 1,471 2,005 (27)% Total assets
84,495 10% Investment 6,247 5,530 13% Property, plant and equipment 151,202 136,860 10% Intangible assets 27,865 27,257 2% Deferred tax assets 2,620 2,233 17% Other assets 1,471 2,005 (27)% Total assets