Derivative Warrants | BJCH08C1606A | DERIVATIVE CALL WARRANTS ON BJC HEAVY INDUSTRIES PUBLIC COMPANY LIMITED ISSUED BY ASIA PLUS SECURITIES COMPANY LIMITED LAST TRADING IN JUNE 2016 # A | Stock in
gasification of biomass.3 Biomass: Any organic matter, i.e. biological material, available on a renewable basis. It includes feedstock derived from animals or plants, such as wood and agricultural crops, and
0.06 4.18 0.05 Animals and plants - net 522.68 10.46 554.37 9.32 501.95 7.11 475.91 5.95 Property, plant and equipment - net 3,681.42 73.63 4,726.71 79.46 6,140.87 86.96 7,227.80 90.40 Advances for
. is operating wind power plants in Nabas, the Philippines (wind power plant of 36 MW in operation, 14 MW in development, and effectively 20 MW installation capacity belongs to BCPG Plc.). 8 | Management
selling volume of Industrial Water to grow significantly resulting from the operation of new power plants this year (1 of the 3 SPPs already achieved COD on July 8,2017) ii) The increase in the selling
management especially from the Cogeneration power plants. Although in 2017, the Sriracha Power Plant had lower dispatch volume to Electricity Generating Authority of Thailand (EGAT) compared to 2016 due to the
Plants (CUP 1-3) and IRPC Clean Power (IRPC-CP) declined. Additionally, there was a decrease in revenue from Availability Payment (AP) of Sriracha Power Plant due to a lower Weight factor during the rainy
last year mainly attributed to increase in Disposal Asset Group classified as held for sales of Power Plants business unit in the amount of THB 149.44 million. After considering the certainty of disposal
wind farms and solar and hydropower plants, to rail transport and building sea walls in cities threatened by rising sea levels. Only a small portion of these bonds have been labelled as green or climate
continuously support and grow together with us. Commercial operation of ABPR4 From a total of 3 SPP power plants in Amata City Industrial Estate that have scheduled COD in 2018, ABPR4 is the second gas-fired