and Bang Sue -Tha Phra) was at 92 percent slightly earlier than the plan. However, the Company has operated trial run service from Wat Mangkon Station to Tha Phra Station in MRT Blue Line Extension on
and both of them are also test run. 10 Total 70 6 Audited Consolidated Financial Statement of IGEN Engineering Company Limited Consolidated Financial Statements of IGEN Engineering Co., Ltd. IGEN
and targeted to lead to $350 million in run-rate cost savings by 2023. These initiatives and the strategic acquisition of the Huntsman Integrated Ethylene and Propylene Oxide (EO & PO) assets (code
3Q 4Q 1Q Business Design Building Construction including M&E Park Decorations Technical Systems in Production Equipment Used in Production Lights & Electronics Installation Producton Test-run Open for
company could only realize the total sales volume from methyl ester plant 1 because methyl ester plant 2 was under testing run for commercial operation. (4) In 2Q/2019, GGC noticed the commercial operating
year. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW has 87.6% construction progress targeted to commence COD on December 1, 2018. ABBREVIATION & OUR PROJECTSFINANCIAL
and target to commence COD and record revenue in December 2018. Nam Che 1 Hydro Power Plant (Run of the river) with an installed capacity of 15 MW have 92.6% construction progress. The COD schedule has
volume during 1-4 April, 2019 from methyl ester plant 2 amounting to 1,615 tons could not be recorded in profit/loss statement because it was under testing run for commercial operation. However, that sales
• Project Olympus is on track and will bring in over US$76M run rate cost savings in 2020 (US$44M realized in 1H20). We enhanced our focused on our 5 strategic priorities as these will help us build
. Project Olympus is on track and will bring in US$76M run rate cost savings in 2020. We decided to remain focused on our 5 strategic priorities as these will help us build sustainable advantages for the