, world trade volume, global economy, and Thai exports to grow slower than expected As of December 31, 2018, the country’s contracted capacity in 3 power authorities system was 48,990 megawatts, 15,790
Limited, BGRIM started to consolidate the financial statement from March 2019. Glow SPP1 has a production capacity of 124 MW of power, 90 t/hr of stream and 190 cu.m of demineralization water per hour with
project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
installed capacity of 20.1 MW, and sells electricity to EDL under a 25-year PPA. The Project was able to achieve commercial operation on July 30, 2017 as scheduled in PPA, and the construction cost is in line
. Net profit in Q3/2017 was Baht 78 million, a decrease of 52% YoY due to 1) higher cost per unit resulted from lower capacity utilization YoY; and 2) higher depreciation resulted from additional
, Rajthanee- Rojana Hospital’ s operation has improved substantially from the previous year. Going forward, business outlook is promising with the capacity expansion plan and significant growth of registered
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
significantly higher than last year quarter due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
quarter due to the Company entered the Tolling agreement with G Steel for producing of HRC to increase the normal capacity during off peak power usage commencing in 4th Quarter of 2017 till to present which