of the total ordinary shares of Akkrawat, the Company has extended the completion of stage 3 investment by changing from within July 31, 2017 to complete within November 30, 2017. From the Board of
16.36 percent of the total ordinary shares of Akkrawat, the Company has extended the completion of stage 3 investment by changing from within July 31, 2017 to complete within November 30, 2017. From the
construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled
from HSMC. HSMC is able to expand or postpone the construction period up to 2 times. If the construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per
from HSMC. HSMC is able to expand or postpone the construction period up to 2 times. If the construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per
) Having backup system and measures for emergency situation to prevent the extended discontinuing of operation. 1.1.2 Document and Information Security Having adequate security system for document and
information should easily be recalled (3) Having backup system and measures for emergency situation to prevent the extended discontinuing of operation. 1.1.2 Document and Information Security Page 16 of 32
(Translation) 9 April 2019 Subject: Disclosure of Additional Information on the Tender Offer for the Securities of Glow Energy Public Company Limited (Form 247-4) No.1 Attention: Secretary-General, The Office of The Securities and Exchange Commission President, The Stock Exchange of Thailand Board of Directors and Securities Holders of Glow Energy Public Company Limited Refers to: Tender Offer for the Securities of Glow Energy Public Company Limited (Form 247-4) dated 22 March 2019 Reference is...
of SPP Cogeneration power plants that will expire between 2016-2025 to be extended or allowing new power plants to be construct according to the same contract. This suggests that the power plants of