revenue was mainly due to airline, airport-related services and other related business and airport which rose by 4.9 percent, 6.1 percent and 17.1 percent respectively. The performance of airline and
Phuket Airport, the development of roads and tunnel, the launch of leading department stores, restaurants and hotel etc. The construction of Carnival Magic Project has currently progressed up to 80% of the
. Currently, the main structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the
Suvarnabhumi Airport. Capable of hosting more than 6 million local visitors and foreign tourists annually, the outlet mall will showcase more than 235 iconic brands, ranging from luxury to mass appeals, as well
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
of 1,990.8 million baht, together with dividend received from investment. Besides, the increasing of revenue was from a constant growth by 6.6 percent in airport-related businesses. Nevertheless, the
at the Chiang Mai Hall, Central Plaza Chiang Mai Airport during 10-12 November 2023.Individuals in the picture (left to right):1. Ms. Archinee Pattamasukhon, Assistant Secretary-General of SEC2. Ms
28,493.3 million baht, increased by 6.5 percent from the same period of the year 2016. This was largely due to a constant growth in airport-related businesses by 12.6 percent from a rising number of flights