MahaNakhon project for sale which are expected to transfer by Q1 2018. Nimit Langsuan Project: Currently, the tower core slip form casting has already passed level 5. Level 2 of the floor slab is fully
. The details of the rental areas for each company are as follows; Entity Floor Rental spaces (sq.m.) The Company 35,36 (Unit B3601), 37 and 39 (partial) 2,587.63 Oishi Trading Company Limited (“Oishi
. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is fully completed, and continually to
including exterior and interior decoration. Nimit Langsuan Project: The construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 11, the floor slab of level 9 is
191/43 CTI Tower 21st Floor, Ratchadapisek Road, Klongtoey Subdistrict, Klongtoey District, Bangkok, 10110 Tel. 0 2204 2601 Fax. 0 2204 2616 7. the Seller and high-level executives of NEXT have entered
รสำร 0 2204 2616 191/43 CTI Tower 21st Floor, Ratchadapisek Road, Klongtoey Subdistrict, Klongtoey District, Bangkok, 10110 Tel. 0 2204 2601 Fax. 0 2204 2616 7. the Seller and high-level executives of
year-high level of 785.38 points on May 9. After that, however, rising oil prices and interest rates hikes caused the global stock market to decline; the SET Index plunged by more than 100 points within
construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 12, the floor slab of level 10 is fully completed, and continually to level 11 respectively. Project
construction of Nimit Langsuan project is in the process of tower core slip form casting reaching level 12, the floor slab of level 10 is fully completed, and continually to level 11 respectively. Project
Insurance Commission) (Available in Thai only) 1. Authorized person 2. High level executives 3. Actuary 4. Auditor