subsidiary have sold total of two pieces of land. For projects, the company is developing, has delayed. However, these projects are on a good progress. First, the non-hazardous waste landfill is now completed
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Hazardous and Construction & Material
Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Hazardous and Construction & Material
Capital 400 Mil.Baht Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Hazardous and
20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Hazardous and Construction & Material Equipment Transportation Service Paid-up Capital 15 Mil.Baht TAKUNI holds 99.99% Takuni (Thailand
and 46.5 million baht respectively. 6. The Investment Update in 2017 - The project of producing RDF from non-hazardous waste in Map Ta Put has been fully constructed in the last quarter of 2017. The
Mil.Baht Rajchapluek Engineering Company Limited Non-Destructive Testing and Inspection services Paid-up Capital 20 Mil.Baht TAKUNI holds 99.99% G Gas Logistics Company Limited Hazardous and Construction
liability 26.0 million baht or 12.4% and shareholders’ equity decreased 58.1 million baht or 4.0%. 4. The Investment Update in 2019 - Non-Hazardous waste recycling plant in Lamphun has been operating since
investment in last year. The Company maintained healthy financial position and sturdy debt service capacity with interest-bearing debt-to-equity ratio of 0.56 times. 2019 Outlook Company maintains 2019 outlook
backlog was THB 16,745mn, decreasing by 6.9% as compared to the end of 2018 of THB 17,981mn. Although the JVs had sturdy sales in The Line Wongsawang, The Line Ratchathewi and The Line Phahonyothin Park