, gross profit of the Houay Ho power plant also decreased along with the lower demand for electricity from EGAT as a result of the lower power generation. On the other hand, gross profit from Sriracha Power
eviction fee amounting THB 223 million in Q2/2020 which is paid by EGAT as a compensation for electric power transmission rights of way; (iii) recognition of gain on bargain purchase after the assessment of
increased from the same quarter of previous year as a result of better performance after major overhaul maintenance shutdown during Q4/2018 together with higher dispatch volume from EGAT instruction. So, the
the Small Power Producer (SPP) scheme, and reliable cash flows from long-term power purchase agreements (PPAs) with the Electricity Generating Authority of Thailand (EGAT) and reputable clients. (Please
combined cycle cogeneration power that commenced COD on June 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
Mae Moh mine, Lam Pang of the Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order issued by the Court
the Electricity Generating Authority of Thailand (“EGAT”), with both venture partners having a 50% interest. As a result of the final receivership order issued by the Court, Saraburi is considered to be
Thailand (EGAT) at the end of 2019, but CPO price substantially increased beyond selling price to EGAT. Consequently, most crushing mills delayed supplying CPO until April 2020. In addition, Ministry of
operation (SCOD) for 16 MW wind farm projects, 13 MW LK Solar Floating and 45 MW EGAT solar floating (EPC service) are extended by 3-6 months to Q1’2021. For communities, under the “B.Grimm Fights COVID-19
scheme and as a result, 3 projects has been considered by EGAT consisting of 6 Power Purchase Agreements (PPA). The projects will be implemented in 2 stages as follows: 5. The first semi-solid battery