achieved Commercial Operation Date in July 2018 with capacity of 7,500 cubic meter per day. Vietnam Project is scheduled to achieve Commercial Operation Date in 2019 with capacity of water treatment plant
counter every 30 minutes. Provide a system to support online payment in order to reduce physical contact with a minimum distance of 1 meter between each other at the service waiting point, including theater
สารสนเทศเรื่องรายการที่เกี่ยวโยงกันของ PAP_SET19017 August 14th, 2019 Re: Connected Transaction Information Office Space Rental (Added the rental rate / square meter/ month) Attn: The Managing
Hua-Hin during this current quarter Gross profit margin at 38.1% which increased by 3.8% compared with the same quarter of the previous year due to • The average selling price per square meter of unit
Associates or Joint Ventures. Projects under Construction Utilities WHA ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment
of Associates and Joint Ventures according to TFRS 16 accounting starndard despite an increase in Retained Earnings of Baht 102.6 million. 26,583 14,419 12,164 26,419 12,859 13,559 Total Assets Total
ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. WHAUP Nghe An Vietnam water
area of 9,252 square meter. Land, proprietary of deed number 27300 address 49 Moo 5 Nontri Kabinburi Prachin Buri. 5.2 AVF 2 Buildings, Land area of 6,500 square meter. Land, 5.3 WBLP proprietary of deed
, Huakwang, Bangkok, for using to be the additional office. The total size is 600.22 square meter with total amount of 27,009,900 baht. 1) Suit No. 240/44 21st Fl Space 300.11 square meter Price 13,504,950
Buildings, Land area of 9,252 square meter. Land, proprietary of deed number 27300 address 49 Moo 5 Nontri Kabinburi Prachin Buri. 5.2 AVF 2 Buildings, Land area of 6,500 square meter. Land, 5.3 WBLP