located in Mandalay, the Republic of the Union of Myanmar. The first 60MWp of this project will be constructed in late 2020 and the commercial operation date for selling electricity to Ministry of
funds which constructed with low active share (
• A related strand of research focuses on price clusters. • Many studies have found that the stock prices tend to cluster around particular numbers (e.g. Harris (1991), Aitken et al. (1996), Brown et al
Habitat Pinklao- Sirindhorn Project Name Thana Cluster Project Type Semi-detached house, 3 Floors-Townhome Price 5-10 MB Number of Projects 5 Projects Project Value (Approximately) 412 MB Units per Project
which are in the process of selling which are (1) K.C. Cluster Nimitmai Project (having outstanding 200 units ) and (2) K.C. Cluster Ramintra 7 phase 1 (having outstanding 35 units). As a result, the
Public Company Limited Page 4/5 5.2 The budget for design and construction of shopping center project is worth 200,000,000 baht which will be constructed by the beginning of the second quarter of 2019 6
+ Exposure P ri c e Underlying stock price Option position Stock position Gamma Risk • In case of a European call option, a hedge portfolio is constructed by establishing a long position in the option and a
leading English-newspapers from US, UK, and Canada, related to war threat, terrorism, military-related political tensions, nuclear, and etc. They are constructed for 14 emerging market countries from 1985
construction of community mall project is worth 230,000,000 baht which will be constructed by the beginning within 2020. 6. Total value of consideration paid or received and basis of calculation The entire
starting from 29 January (Commercial Operation Date) with the total installed capacity of 69 MW . Currently, the Project is completely constructed and in its commercial operation with the following details