sectors or buildings, electrification is a key means to achieving decarbonisation. This is all while ensuring this infrastructure is adapted to changes in climate. The dependence of so many sectors and
primary source of income for the smallholder and their family (adapted from AFi, 2019). Stranded assets: Assets which, at some point prior to the end of their economic life, are no longer able to earn an
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth
; • (ix) Eco-efficient and/or circular economy adapted products, production technologies and processes; • (x) Green buildings. • Fossil fuel power generation projects are excluded Regional standards: Global
DJSI. If yes, assess whether the disclosure can be applied to TCFD 3.3 3.4 Evaluate internal risk management processes and consider whether they can be adapted to incorporate climate-related risks
publications) 2 What has the firm taken into account when network requirements or professional publications need to be adapted or supplemented in order to, for example, implement consistency, comply with