progressed 97.45% (The construction plan was 97.09%). The commercial operation date is scheduled in the fourth quarter of 2019. Page 6 - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds
. EGCO Rayong Industrial Estate A. Next-Generation Automotive Banpho B. E-Commerce Bang Pakong EEC Promotional Zones 26 Industrial Estates Industrial Clusters2 5 EECh High-Speed Rail Ribbon Sprawl Location
0.2098 4.95 24/01/2022 5.1599 0.2098 4.95 246016272201-1 FSS APEX SPEED HOLDINGS LIMITED Acquisition Stock 9.4009 1.7199 11.1209 18/01/2022 9.4009 1.7199 11.1209 246019572207-1 FSS PILGRIM FINANSA
) 2 % หลัง ได้มา/ จำหน่าย (กลุ่ม) 2 หมายเหตุ 3 PDF หมายเลข FSS นาย ชวัล เจียรวนนท์ จำหน่าย หุ้น 5.1599 0.2098 4.95 24/01/2565 5.1599 0.2098 4.95 246016272201-1 FSS APEX SPEED HOLDINGS LIMITED ได้มา
project has entered into the PPA with EGAT with the contracted capacity of 514 MW and EDL with the contracted capacity of 130 MW for 27 years. The construction of the project has progressed 66% (The
with the Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 75.48% (The
abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation from all related parties.
enhance the speed and efficiency of the trading process of corporate bond. Currently two companies have issued and offered corporate bonds for sale using the blockchain system of ThaiBMA, namely (1
lessen burdens on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related parties.
obstacles to living or occupations will be abolished or revised to lessen burden on people. By doing so, methods used must be done with speed, transparency, low costs with participation of all related