Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
in industry situation, the company still maintained the market leader position and partly from the fire incident at UHT production line, which was fully covered by insurance for properties damaged and
million or 18.9% from Q2’2017, mainly from total green tea market declined but we still maintained as market leader and some part from fire incident of UHT production line, which was fully covered by
regulations. Whereas the laws or regulations that are no longer necessary or outdated, or become obstacles to public livelihood or occupation will be repealed or revised to eliminate burden on people and
81.17% from that in the same period of the previous year of Baht 161.61 million. The segment of revenues from sales and services by business. (Unit: Million Baht) Q1/2017 Q1/2016 Fire protection systems
Fire protection systems and projects 159.24 165.58 Air-conditioning and sanitary products 21.03 13.04 Refrigeration systems 89.22 - Digital printing systems 75.20 - 344.69 178.62 The segment of gross