Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth
Structural Mechanical Piping Electrical & Instrument service (SMP E&I) and Civil construction service. As at 31 March 2019, the Group has backlog for construction service in oil and gas sector totaling of
income for the year sharply increased 212.56 Million Baht, accounting for 61.87% from previous year as the increased in Structural Mechanical Piping Electrical & Instrument service (SMP E&I) and
. The principal business operaton of the Group are summarized in 4 categories as follow; 1. EPC Serive such Engineering, Procurement, Construction, and Construction management, 2. Structural Mechanical
Mechanical Piping (SMP) and Electrical and Instrument service, 3. Civil and Building service. 4. Fabrication and Other service. For the Group’s 2017 operation ended 31 December 2017 could summarize as follows
Energy Regulatory Commission (ERC) for final approval. The project targets for 85% contracted by commercial operation date. The construction of the project has progressed 61.24% (The construction plan was
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The