Excavation 3 Soil and Coal Milling Project at Mae Moh Mine, Contract No.6 decreased. Due to heavy rain in the project area, the operation could not be done at full capacity resulting in the loss from regular
of Power Category of Plant Equity Holding (%) Contracted Capacity (MW) Equity Capacity (MW) GHECO-One Coal-fired IPP 35.00 660.0 231.0 Glow IPP Gas-fired Cogeneration IPP 5.00 713.0 35.7 Houay Ho Power
company increased by Baht 1,154 million or 118% from Q4/2018 and increased by Baht 646 million or 43% from Q1/2018. The increase was mainly due to improved operating results of the Sriracha Power Plant and
Energy Earth Public Company Limited On February 7, 2019, Energy Earth Public Company Limited ("EARTH") disseminated information about the value of the right of 2 coal mines in Indonesia
Mr. Sawin Chindakul On February 7, 2019, Energy Earth Public Company Limited ("EARTH") disseminated information about the value of the right of 2 coal mines in Indonesia according to
Miss Paradee Teawanitchakul On February 7, 2019, Energy Earth Public Company Limited ("EARTH") disseminated information about the value of the right of 2 coal mines in Indonesia according
Mr. Noppadon Chaidarun On February 7, 2019, Energy Earth Public Company Limited ("EARTH") disseminated information about the value of the right of 2 coal mines in Indonesia according to
subscribed to the Warrants (IVL-W2) where the last date of subscription is in August 2018 thereby enabling the Company to raise a further over $ 220 million in year 2018 so far. The gearing ratio improved by
subscribed to the Warrants (IVL-W2) where the last date of subscription is in August 2018 thereby enabling the Company to raise a further over $ 220 million in year 2018 so far. The gearing ratio improved by
well as the profit of Phu Fai Mining Company Limited, a joint venture for coal mining and trading to HPC, in a portion of 37.5 percent increased in the amount of Baht 13.51 million, as Hongsa Power