Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
in industry situation, the company still maintained the market leader position and partly from the fire incident at UHT production line, which was fully covered by insurance for properties damaged and
million or 18.9% from Q2’2017, mainly from total green tea market declined but we still maintained as market leader and some part from fire incident of UHT production line, which was fully covered by
81.17% from that in the same period of the previous year of Baht 161.61 million. The segment of revenues from sales and services by business. (Unit: Million Baht) Q1/2017 Q1/2016 Fire protection systems
Fire protection systems and projects 159.24 165.58 Air-conditioning and sanitary products 21.03 13.04 Refrigeration systems 89.22 - Digital printing systems 75.20 - 344.69 178.62 The segment of gross
. ?The OECD?s revised Principles of Corporate Governance could ignite new developments in the Thai capital market. We need cooperation from stakeholders of all sectors in applying these latest guidelines
million, decreased by Baht 72 million or 4.0% from Q3’2017, mainly from declining in total green tea market while the company still maintained market leader position, and partly from the fire incident at