Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
ABPR5 After the commencement of commercial operation of ABPR3 (with 133 MW installed capacity) in February and ABPR4 (with 133 MW installed capacity) in June, ABPR5 (with 133 installed capacity
construction may not be completed within the extended period, HSMC will require to pay MCDC of 20,000 MMK per day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled
day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled Commercial Operation Date Within Quarter 1/2019 Expected Capital Expenditure THB 40-60 mn Project Risk HSMC
day. Capacity (m3/day) 2,000-2,200 m3/day Construction Period Within Quarter 4/2018 Scheduled Commercial Operation Date Within Quarter 1/2019 Expected Capital Expenditure THB 40-60 mn Project Risk HSMC
scheduled to achieve Commercial Operation Date in January 2018. WHA ESIE 4 water treatment plant achieved COD in January 2018 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500
capacity and took advantage of our increased capacity to maximize production in anticipation of a strong sugar season. The fourth quarter was even stronger than forecasted with volumes up over 30% in
Efficiency Report, ESMA Energy Renewable Capacity Installed renewable energy capacity in GW or % (consolidated) 7 Climate Change Mitigation IEA World Energy Outlook IRENA, RE100 Energy - % of renewable
stage of production; therefore, the production is unable to operate at its full capacity. Moreover, an increase in prices of sugar and garlics, which are the main raw materials used in the production, has