plant project to generate and sell electricity from natural gas in Dawei, Myanmar with two year operation period, starting from June 26, 2014. At present, however, it has not commenced commercial
plant project to generate and sell electricity from natural gas in Dawei, Myanmar with two year operation period, starting from June 26, 2014. At present, however, it has not commenced commercial
used in the construction of world class theme park. The management of Carnival Magic initially started with overall design and main structure of the project. Currently, the main structural design is
used in the construction of world class theme park. The management of Carnival Magic initially started with overall design and main structure of the project. Currently, the main structural design is
addition, sales of Municipal Solid Waste Power Plant increased by Baht 49.8 million or 69.7% from revenue recognition of Municipal Solid Waste Power Plant in Krabi which started its commercial operation on
solar power plant project in Myanmar (Green Earth Power (Thailand) Co.,Ltd.) increased and not yet been started the commercial operation. However this project is expected to be started the commercial
Prachinburi plant and utilizing the plant to produce the products, the production cost has been lowered and gross margin has been higher than those in 2016. The Company started production in Prachinburi plant
plant to produce the products, the production cost has been lowered and gross margin has been higher than those in 2016. The Company started production in Prachinburi plant in January 2017. Please be
due to market competition and low factory workload at the time. Project startup delays for these projects meant that, instead of the staggered production as originally planned, these projects started
due to market competition and low factory workload at the time. Project startup delays for these projects meant that, instead of the staggered production as originally planned, these projects started