control the system concentration limit not concise and does not manage the mutual fund management program as approved. SEC Act S.117 and 125(1) in conjunction with Section 90 of the Penal Code
ของรายงานทางการ เงินที่จัดทําผา่นโปรแกรมที่บริษทัใช้ • ผู้สอบบัญชีประเมินระดับการใช้คอมพิวเตอร์ของบริษัทฯว่าอยู่ในระดับสูง อีกทั้ง ประเมินผล general control และ application control โดยการใช้ IT control
control OR "electrical control" OR "electric manage" OR "electric oversee" OR "power manage" OR "power oversee"&wt=json&indent=true&facet=true&facet.field=key_filetype&facet.field=key_sitemap&facet.field
2019 as well as having the enhancing cost control measures. The details of the Company's performance were as follows: 2018 2019 YoY Mio. % Mio. % Mio. % Rental and Service Income 534.1 58.3% 465.9 50.2
or 6.70%. In Q3/2017, none of the projects will be completed and handed over. It will be the income recognition of the projects that are completed in the previous period. The Company has launched one
% was the income recognition of the projects completed at the end of 2016. The Company launched 11 projects in 2017 with the combined value of 14,000 million THB. As of 31st December 2017, the backlog of
Limited due to competitors introducing similar model into the Thai Market since Q3 2019 2. Stopped interest income recognition on the loan to SGAH since Q2 2019 3. Loss on change in status of investment in
receivables from Construction service increased 264.67 Million Baht as revenue recognition was more than billing amount. - Purchase of tools and equipment for construction service and testing and inspection
). Changes in foreign currency exchange rates had a minor impact on the revenue recognition in Thai baht terms in the current quarter (Table 1). To minimize the impact of COVID-19 in the second quarter of 2020
▪ Eligible green projects (indicative) under ASEAN GBS: • (i) Renewable energy; • (ii) Energy efficiency; • (iii) Pollution prevention and control; • (iv) Environmentally sustainable management of living