2019) of property, plant and equipment Mr. Geza Perlaki Mr. Krishnan Subramanian Aylur Authorized Director Authorized Director หน่วย: ล้านบาท FY 2563 YTD FY 2562 YTD YoY change YoY % change เงินสดและ
constructing the plant 5.06 Water well 10 years rental 12.00 Design and exploration cost 5.00 Construction cost - Buildings and infrastructure 38.37 - Machines and system 109.63 - Pipeline 66.94 7. Source of
, plant and equipment (1,132) Increase in deferred tax assets (1,094,526) Decrease in accrued expenses 7,484 Decrease in retained earnings 30,557 Weighted-average incremental borrowing rate (% per annum
)/ Average (Q4 2019 and Q4 2018) of property, plant and equipment Mr. Geza Perlaki Mr. Krishnan Subramanian Aylur Authorized Director Authorized Director Q1 2563 Q1 2562 FY 2563 FY 2562 อัตราผลตอบแทนต่อผู้ถือ
Baht, increased by 915.82 million Baht or 4.32% from the end of the year 2019 due to the changes in the following items: - Property, plant and equipment were 15,708.47 million Baht, increased by 447.52
9.9% Property, plant and equipments, net 18,768.6 19,449.0 680.4 3.6% Total non-current assets 24,035.0 25,904.0 1,868.9 7.8% Total assets 29,161.6 31,539.1 2,377.5 8.2% Total interest-bearing debt
0274 Galvanizing Plant 2 41-318-306-0275 to 0284 Crain 10 41-318-306-0285 Boiler 1 41-318-306-0286 Wasted Water Treatment 1 Total (Machine) 90 Enclosure Location 88 Rama II Road (Thonburi – Paktor) Moo 2
8,553.07 million as of December 31, 2019 of Baht 331.49 million or 3.88% primarily of the significant changes are from the additional purchase of property, plant and equipment of Baht 391.52 million mostly
realized the revenue of 43.04 million Baht from the decreased in sales volume by 22.54 % due to the plant improvement. 1.4 Sea Freight Service AIL has ceased its business operation and sold its last vessel
mainly consist of salaries of back office staff, utility expenses, and depreciation of property, plant, and equipment in the back office. 2020 vs 201912M 38 39 162 148 Q4/19 Q4/20 2019 2020 13.3% 18.6% 3