attack of the large Saudi Arabian refineries in this past September. During this quarter Bangchak refinery had a utilization rate of 110. 8 KBD due to the planned maintenance of the Hydrocracking Unit to
placement basis which shall be described in more detail later on. As a result, the Company shall be confident that it shall raise such necessacy capital as planned. (b) if there are any newly issued shares
placement basis which shall be described in more detail later on. As a result, the Company shall be confident that it shall raise such necessacy capital as planned. (b) if there are any newly issued shares
Associates or Joint Ventures. Projects under Construction Utilities WHA ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment
construction plan was 97.00%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49% ownership interest.), is
Extraordinary General Meeting of Shareholders No. 1/2020, which is scheduled to be held on 25 February 2020, and seek approval for any person(s) assigned by the Board of Directors to have the authority to perform
ESIE 3 water treatment plant is scheduled to achieve COD in 1Q2020 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. WHAUP Nghe An Vietnam water
25-year Power Purchase Agreement (PPA) with the tariff of USD 6.5 cent per kWh. The project was able to achieve COD as scheduled in PPA, and construction cost is in line with the budget approved. Move
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company
the same level, slightly increased. Moreover, there were major overhaul maintenance of Sriracha plant and planned maintenance of IRPC-CP, plus the drop in dividend income from Ratchaburi Power Company