% 22,704 6.4% 2022 - 14,142 - 7,565 - 3,473 ST loan & CP of LT loans 18,748 5.4% 15,095 4.2% 2023 7,820 7,689 - 7,565 - 3,473 CP of lease liabilities 10,213 2.9% 10,429 2.9% 2024 6,638 6,805 - 7,565 - 3,473
& CP of LT loans 14,132 4.0% 13,152 3.7% 2024 6,638 6,805 7,565 - 3,473 CP of lease liabilities 10,537 3.0% 10,857 3.1% 2025 - 7,848 7,565 2,934 3,473 Accrued R/S expense 3,361 0.9% 3,361 0.9% 2026 8,180
8.3% ST loan & CP of LT loans 14,132 4.0% 20,300 5.8% CP of lease liabilities 10,537 3.0% 11,330 3.2% Accrued R/S expense 3,361 0.9% 3,361 1.0% CP of spectrum payable 10,903 3.1% 10,966 3.1% Others
3% 15,940 4.6% Defer tax asset 4,236 1.2% 4,124 1.2% Others 5,363 1.5% 5,880 1.7% Total Assets 356,222 100.0% 345,369 100% Trade payable 26,745 7.5% 29,677 8.6% ST loan & CP of LT loans 14,132 4
3% 15,940 4.6% Defer tax asset 4,236 1.2% 4,124 1.2% Others 5,363 1.5% 5,880 1.7% Total Assets 356,222 100.0% 345,369 100% Trade payable 26,745 7.5% 29,677 8.6% ST loan & CP of LT loans 14,132 4
1.5% 5,880 1.7% Total Assets 356,222 100.0% 345,369 100% Trade payable 26,745 7.5% 29,677 8.6% ST loan & CP of LT loans 14,132 4% 31,375 9.1% CP of lease liabilities 10,537 3% 11,308 3.3% Accrued R/S
a 500 MW supercritical coal-fired power plant, in Mauban, Quezon province of Republic of the Philippines. 455 MW of the plant’s capacity and energy are contracted to the Manila Electric Company
, the conglomerate has a new business plan that is the 100% battery electric vehicles, which the subsidiary require production space for setting up line of assembling the mentioned electric vehicle and
, the conglomerate has a new business plan that is the 100% battery electric vehicles, which the subsidiary require production space for setting up line of assembling the mentioned electric vehicle and
Korea Electric Power Corporation (KEPCO), the sole off-taker of wholesale power generation in South Korea, through the Korea Power Exchange (KPX). Gangdong also sells thermal energy, and receive renewable