with installed capacity of 10.5MW in Japan is under construction and expected to COD in Q1 2018, which will boost the total capacity to 50MW. PDI remains actively looking for projects with acceptable
2016 increased production capacity for existing products as well as new high-end products, which the Company started to produce commercially towards the end of 2016. The increased capacity enabled the
used decreased. And the use of capacity at 3.24% of total capacity increased from same period of 2016, resulting in lower unit cost. As a result, the gross margin in 2017 increased to 21.7% from 13.8% in
installations of new machines throughout the year 2017. So, the Company had an increase in production capacity beginning from Q2/2017 for existing products as well as new high-end products, which enabled the
increase the normal capacity during off peak power usage in 4th Quarter of 2017. - Gain from debt restructuring was achieved of THB 734 million some portion resulting from debt-to-equity conversion scheme in
for producing of HRC to increase the normal capacity during off peak power usage in 4th Quarter of 2017. - Gain from debt restructuring was achieved of THB 734 million some portion resulting from debt
installations of new machines throughout the year 2017. So, the Company had an increase in production capacity beginning from Q2/2017 for existing products as well as new high- end products, which enabled the
machines throughout the year 2017. So, the Company had an increase in production capacity beginning from Q2/2017 for existing products as well as new high- end products, which enabled the Company to
Generation Capacity of Nava Nakorn Electr icity Generating Company Limited Nava Nakorn Electricity Generating Company Limited (an indirect joint venture in which Ratchaburi Electricity Generating Company