/201911/19104563.pdf 18057832.pdf electrical generating capacity; 4.1.2 HHPC hydroelectric IPP plant located in Attapeu province, Laos PDR with 152 MW of electrical generating capacity; 4.1.3 GHECO-One
%) 751.4 680.5 (9.4%) Sales of electricity to Industrial Users (IU) 1.3 1.1 1.4 27.3% 7.7% 2.9 2.5 (13.8%) Sales of steam (IU) 4.4 2.5 2.9 16.0% (34.1%) 9.3 5.4 (41.9%) Sales from Natural Gas Power Plant
1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21
Asoke-Ratchada 2,396 The BASE Garden Rama 9 1,609 The LINE Wongsawang 1,276 Total 9,473 Within 1Q 2018, on 16 March 2018, the Company acquired a 50% stake in all BTS-Sansiri JV projects from BTS as part
BACKLOG (THB mn) The LINE Ratchathewi 2,878 The LINE Asoke-Ratchada 115 The BASE Garden Rama 9 1,363 The LINE Wongsawang 1,131 Total 5,488 As of 9 July 2018, the company has a non-equity stake-adjusted
electricity to Industrial Users (IU) 1.1 1.6 (0.5) (31.3) Sales of steam (IU) 2.5 4.9 (2.4) (49.0) Sales from Natural Gas Power Plant 422.3 470.8 (48.5) (10.3) Sales of electricity - FiT, Base tariff and Ft
from power plant is Baht 44.89 million, or 47.12%. By an increase of Baht 43.67 million from the Solar power plant, Kurihara 2 project in Japan which began commercial electricity distribution (COD) on 25
landfill is complete. However, the landfill cannot be used until authorities have checked the landfill and issue the permit. The permit is expected to be issued by Q3/2018. A new recycling plant (for non
with M&G USA Corp. and its affiliated debtors (“M&G”) to acquire the integrated PTA-PET plant currently under construction in Corpus Christi, Texas (the “Corpus Christi Project”), along with certain M&G