Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 9. Stockpile water from Bangpakong river into Bangphra
and new ponds, to supply water to Chonburi and Chachoengsao areas 8. Upgrade Chachoengsao pump station to increase pumping capacity from Bangpakong River from 200,000 CMD to 300,000 CMD 4. SIGNIFICANT
shifting to low carbon fuel sources • Improving water management and efficiency, e.g., by reducing leaks, reducing urban run-off • Installation or upgrade of water capture and storage infrastructure
design for lighting shows, consisting of more than 40 million lights also requires more cables and equipment of installation of lighting system. There are also more details added to the lighting parade to
design for lighting shows, consisting of more than 40 million lights also requires more cables and equipment of installation of lighting system. There are also more details added to the lighting parade to
Universal. Moreover, the completed design for lighting shows, consisting of more than 15 million lights also requires more cables and equipment of installation of lighting system. There are also more details
, following Disneyland and Universal. Moreover, the completed design for lighting shows, consisting of more than 15 million lights also requires more cables and equipment of installation of lighting system
from the contributions of 1) additional industrial users with total PPA of 25 MW, 2) ABP3 and ABP5 improving heat rate after gas turbine upgrade in December 2018 - January 2019 and July 2019 respectively
noticed in Q2’19. In additions, the same upgrade via LTSA with Siemens for ABP5 is scheduled in Q3’19. The progress of SPP Replacement Scheme BGRIM has 5 cogeneration power plants qualified for the SPP
IP: INTER PHARMA PUBLIC COMPANY LIMITED L&E: LIGHTING & EQUIPMENT PUBLIC COMPANY LIMITED PAP: PACIFIC PIPE PUBLIC COMPANY LIMITED PRINC: PRINCIPAL CAPITAL PUBLIC COMPANY LIMITED PSL: PRECIOUS SHIPPING