of 657 million Baht, (3) impairment loss of 3,400 million Baht. 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road
6 December 2007 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654
6 December 2007 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654
, passing Bang Pai, Bang Wa, Phasi Charoen, and Bang Kae, and ends at Kanchanapisek Road, totaling 9 kilometers of elevated structure with 7 stations. Section 3 Tao Poon Station - Tha Pra Station: within 36
, Phasi Charoen, and Bang Kae, and ends at Kanchanapisek Road, totaling 9 kilometers of elevated structure with 7 stations. Section 3 Tao Poon Station - Tha Pra Station: within 36 months or within March
impacted by declining global demand, which has also led to a deceleration of private consumption as a result of lower employment, particularly in export- related manufacturing sectors. Elevated household
6 December 2007 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654
6 December 2007 1 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654
Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless Road, Lumpini, Pathumwan, Bangkok 10330 Tel. 66 2 654 3344 Fax. 66 2 654 3323 บทสรุปผู้บริหาร (ต่อ
Thailand Advance Info Service Public Company Limited (AIS) would like to inform the spectrum auction result participated by Advanced Wireless Network Co.,Ltd. (AWN), a 99% subsidiary of the Company, on 16