located in the industrial eastern seaboard of Thailand in Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31
while the decrease in revenue of the combined cycle power plant is caused by temporarily shut down for major maintenance. Please be informed accordingly. Yours faithfully, (Mr.Pijayaphong Na Bangxang
that it has completed all closing formalities and has taken charge of the operations effective September 29, 2017. The Plant is co-located with IVL’s Indorama Ventures Polymers Mexico, S.DE R.L. DE C.V
year 2016 ECF Holdings Company Limited, as the subsidiary of the Company by holding 75 percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan
GFPT PUBLIC COMPANY LIMITED PLANT: 209 MOO 1, TEPARAK RD., K.M. 20.5 BANGSAOTONG, SAMUTPRAKARN 10570, THAILAND TEL. 02-315-9400 FAX: 02-315-9433-6 OFFICE: GFPT TOWER, 312, RAMA 2 ROAD, BANGMOD
inventories. Assets decreased from Land, plant and equipment, which decreased from depreciation. 2 There were total liabilities of 302.4 Million Baht increased by 66.8 Million Baht from trade payable, others
GFPT PUBLIC COMPANY LIMITED PLANT: 209 MOO 1, TEPARAK RD., K.M. 20.5 BANGSAOTONG, SAMUTPRAKARN 10570, THAILAND TEL. 02-315-9400 FAX: 02-315-9433-6 OFFICE: GFPT TOWER, 312, RAMA 2 ROAD, BANGMOD
GFPT PUBLIC COMPANY LIMITED PLANT: 209 MOO 1, TEPARAK RD., K.M. 20.5 BANGSAOTONG, SAMUTPRAKARN 10570, THAILAND TEL. 02-315-9400 FAX: 02-315-9433-6 OFFICE: GFPT TOWER, 312, RAMA 2 ROAD, BANGMOD
and waiting for the permission to use the landfill. Secondly, a recycling plant in Lampoon is expected to be complete the construction in November 2018. Lastly, a waste water pre-treatment plant is now
, an increase of 18,197 tons or 22% compared to 3Q/2018 due to the incremental capacity of methyl ester from methyl ester plant 2 in 3Q/2019. Meanwhile, natural fatty alcohols sales volume was sold at