. During the quarter, the Sansiri JV transferred units of the ready-to-move-in The Line Wongsawang, The Line Ratchathewi, The Line Asoke- Ratchada and Base Garden Rama 9 projects. On 22 September 2018, the
currently is in improvement process. In case of the subsidiary has necessity to move out of rental space, this plot of Land can be substituted for the business operation. For the Company’s business operation
District Samut Sakhon Province, which can be utilizable and currently is in improvement process. In case of the subsidiary has necessity to move out of rental space, this plot of Land can be substituted for
. Projects that were completely transferred in 2019; (i) The Base Garden Rama 9, (ii) The Line Ratchathewi, (iii) The Line Asok-Ratchada. 6 ready-to-move in projects comprised of, (i) The Line Wongsawang, (ii
total remaining backlog was THB 1,288mn, decreasing by 70% compared to the previous quarter of THB 4,284mn from the value transferred of 6 ready-to-move-in projects (i) The Monument Thonglor, (ii) The
worthwhile from business rehabilitation when compared to the rental cost. In case of the subsidiary has necessity to Enclosure move out of rental space, the Company has own another plot of Land, located at 91
are able to move easily and the menu served requires little processing and time to prepare. This was able to respond to the changing consumer behavior. The Company is in the process of preparing and
หัวข้อ U.S. SEC’s Move on Digital Assets โดย Ms. Hester Peirce กรรมการ ก.ล.ต. สหรัฐอเมริกา (U.S. SEC Commissioner)” ความเห็นต่อไปนี้เป็นความเห็นในฐานะส่วนตัว ซึ่งไม่จำเป็นต้องสอดคล้องกับความเห็นของ U.S
the construction into the river. : No. 1/2015 dated January 19, 2015 issued by Harbor Department pass through Na Toei District Administrative Organization which is a reinforced concrete bridge acrose Na
) ในรายละเอียดในลักษณะเป็น safe harbor (3) ส านักงานอาจก าหนดให้ผู้ประกอบธุรกิจขอความเห็นชอบด าเนินการใดตามประกาศนี้ก่อนได้ (4) หากผู้ประกอบธุรกิจไม่ปฏิบัติตามประกาศหรือข้อก าหนดที่ออกตามประกาศนี้ ส า