study and develop the power plant project using LNG as fuel, including the project of import and distribution of LNG to fuel the power plant in Vietnam. The remarkable performance with the highest NNP in
Republic of Korea with strongest local partners Establishment on 28 February 2019, B.Grimm Power Korea Limited is now ready for our effective expansion of renewable power business in the Republic of Korea
, operating profit would decrease by Baht 75.3 million or 45.6% if excluding the write-off of plant and equipment from the renovation of River Wing building amount of Baht 79.0 million. For expenditures, the
venture has received all regulatory clearance required from the United States Federal Trade Commission (“FTC”) for the proposed acquisition on December 21, 2018. The Corpus Christi plant will have nominal
new plant on the IPI factory site at Rayong for the production of PA66 airbag yarns with an annual production capacity of 11,000 Mts. Toyobo will offtake 100% of the production for its weaving plant. A
4.9 4.4 (10.2%) 33.3% 7.5 9.3 24.0% Sales from Natural Gas Power Plant 519.8 470.8 496.5 5.5% (4.5%) 1,042.4 967.3 (7.2%) Sales of electricity - Base tariff and Ft 27.2 27.8 25.3 (9.0%) (7.0%) 51.5 53.1
%) 751.4 680.5 (9.4%) Sales of electricity to Industrial Users (IU) 1.3 1.1 1.4 27.3% 7.7% 2.9 2.5 (13.8%) Sales of steam (IU) 4.4 2.5 2.9 16.0% (34.1%) 9.3 5.4 (41.9%) Sales from Natural Gas Power Plant
1.9 0.8 72.7% 13.3 8.4 (4.9) (36.8%) Sales from Natural Gas Power Plant 422.3 466.9 507.7 568.3 60.6 11.9% 1,814.5 1,965.2 150.7 8.3% Sales of electricity - FiT, base tariff and Ft 70.1 72.2 59.5 74.1
of hydro project in Lao PDR Nam Che 1 hydro power plant (Run of the river) with an installed capacity of 15 MW commenced COD on June 1, 2019 to supply electricity to Electricity du Laos (EDL) under a
Significant events for 2020 to present The acquisition and transfered of 3 biomass power plant companies with total installed power generation capacity of 26.9 MW from UA Withya Public Company Limited On 21