statements for Q2/2019 to the SEC within the specified period. The Criminal Court sentenced the accused to pay a fine of Baht 1,739,000. Since the accused pled guilty, the Court reduced the fines by half
. Since the accused pleaded guilty, the Court reduced the fines by half, resulting in a fine of Baht 4,000 and a further fine of Baht 50 Baht each day for 5,146 days starting from November 15, 2019 until
severely contracted as a result of the Coronavirus 2019 (Covid-19) outbreak which began in late January. Income from the tourism heavily declined as a result of international travel restrictions that were
higher capital budget framework. As of December 31, 2017, the country’s contracted capacity in EGAT system was 42,433 megawatts, 16,071 megawatts or 37.87 percent of which were generated by EGAT power
project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
and services segment showed improvement during the last quarter of the year as a result of the government’s economic stimulus. Private investment contracted in all investment categories from the
, world trade volume, global economy, and Thai exports to grow slower than expected As of December 31, 2018, the country’s contracted capacity in 3 power authorities system was 48,990 megawatts, 15,790