Baht 100 per share) which is accounted for 50.00 percent of registered capital after the capital increase of ERV. ERV plan to invest in Cooling Tower System Installation Project for energy saving. Total
period last year, which was driven by SSSG of 6.8% in our hardline retailing in Thailand category, and the introduction of new merchandise and the installation of in-store amenities such as air
Sales and Services Income 720.81 766.32 (45.51) (5.94%) - LPG Trading 108.72 188.21 (79.49) (42.23%) 1 - Transportation 3.90 3.70 0.20 5.41% - Conversion Kit Installation 0.34 0.62 (0.28) (45.16
installation of the new machinery, therefore, it is necessary to choose the location of the factory that made this transaction at the same place as the machinery location. In Bangpoo Industrial Estate is a
Transmission Tower Installation and Cable Network System in accordance with contract terms were high. Maintenance and Service Business For the year ending 31 December 2018 and 2019, the Company’s revenues from
Analysis for the six-month period ended 31 March 2017 General information Eastern Technical Engineering Public Company Limited operates management service, installation service of electricity distribution
% of the total increase from the same period of last year; while the other 30% is from the growth of revenue from other subsidiaries. For the Company, the installation of new machines throughout the year
and Installation machine business. 2. Eureka Design International Pte,.Ltd. (Singapore) , Investment in overseas business. This disposition is considered as the assets disposition transaction of listed
the amount included expenses related to Asia Can Manufacturing (“ACM”) which is currently under the construction, machine installation and system preparation process before the commercial plan in 4Q
Project Management, Supply and Installation of the M&E Systems for the MRT Blue Line Extension Project at the project inception. Cost of construction services and sales of construction materials The Company