Meteorology was expected that the total rainfall in the Eastern part of Thailand will be higher than average by about 15% in May, and move closing to the average level in June. The average water in the
from (1) and (2), it has been found that the Company still has high limitation. Hence, the Company has studied the possibility to move the location of the project to reduce the distance for raw material
through the acquisition of Multi Sign Company Limited (“Multi Sign”) and Comass Company Limited (“Comass”). This strategic move enabled us to jump our media coverage nationwide and gather wider audience
water quantity of the past 10 years. The weather forecast of the Department of Meteorology was expected that the total rainfall in the Eastern part of Thailand will be move closing to the average in July
projects launched, sales volume and backlog as of 31st March 2020 The sales volume in Q1/2020 is 2.62 billion THB i.e. 2.1 52.92% are ready-to-move-in projects completed before 2020 comprising 36.77
kiosks, which help people not to move far from their home area. Nevertheless, the Covid-19 pandemic can be viewed as a catalyst to accelerate the change of consumer behavior, which will result to a “New
(Run of the river) with an installed capacity of 15 MW have 97.3% construction progress. The COD schedule has been shifted slightly from December 1, 2018 to 1H’2019 due to longer time for Lao PDR’s
been shifted slightly from December 1, 2018 to Q1’2019 due to longer time for Lao PDR’s government to patrol and survey all hydro power projects after the heavy flood from the collapse of one saddle dam
the schedule for the stone laying ceremony on November 9, 2019. Although the sales plan of residences is shifted to 2020 from late 2019, the Company confirms that the project will be completed as per
the schedule for the stone laying ceremony on November 9, 2019. Although the sales plan of residences is shifted to 2020 from late 2019, the Company confirms that the project will be completed as per