long-term returns. In 2019, CPN progressed with the following asset enhancement initiatives. Renovation programs of existing malls are under way and expects to be completed in 2019 comprising a
Annual Report 2009 1 Annual Report 20092 Over the past year, the Thai economy experienced a recession for the first time since the Asian economic crisis in 1997. The first quarter saw a 7.1 percent contraction as a result of sluggish export in the midst of global financial crisis, diminishing demand of domestic private sector, and lack of confidence in economic and political directions. All these factors played out against a backdrop of weakening economies of our trade partners worldwide, which...
structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the development of utility
. Currently, the main structural design is completed and the construction of various buildings has progressed by more than 80% of the total construction. At present, the project is in the process of the
amount of THB 3.55 million (2 installments). The remaining amount to be paid upon the Agreement is THB 5.33 million. Currently, hydraulic platform construction work has progressed to around 50 percent. 4
progressed 62.79% (The construction plan was 62.55%). The commercial operation date is scheduled in the second quarter of 2022. Page 3 1.2 Additional Investments in Joint Ventures - On September 25, 2019, EGCO
Directors’ Meeting No. 5/2018 and PF Board of Directors’ Meeting No. 9/2018. The construction of Carnival Magic Project has progressed by about 98.56% of the total construction, or 84.63% of the total
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
completed and the construction of various buildings has progressed by more than 84.63% of the total construction. At present, the project is in the process of the development of utility system including the
revenue and generate a sustain long-term returns. In 2019, the Company progressed with the following asset enhancement initiatives. Renovation programs of existing malls which have been completed in 2019