maintenance shutdown in the last quarter. Consequently, the gross profit in Q2/2017 increased by Baht 158 million or 14% from Q1/2017. When compare Q2/2017 with Q2/2016’s net profit, Q2/2017’s net profit
0.4 million and gain on foreign exchange translation of Baht 31.4 million Power plant Type of power Category of producer Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) COD Gulf TS1 Gas
presented in Figure 2 Figure 2 The country’s contracted capacity of electricity in 2017 classified by producer Source: Electricity Generating Authority of Thailand In the second quarter of 2017, Ministry of
, is scheduled to achieve COD in 4Q2019. 5 Power plant Type of power Category of producer Equity holding (%) Installed Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Rooftop Solar
+/(-) 9M/17 9M/18 Change +/(-) (THB million) QoQ YoY YoY Indepent Power Producer (IPP) - Xayaburi Power Company Limited (XPCL) 25% (5) (6) (6) 0% (20%) (15) (19) (27%) Small Power Producer (SPP) - Bangpa-in
to achieve Commercial Operation Date in 4Q2019. Power plant Type of power Category of producer Equity holding (%) Contracted Capacity (MW) Equity Capacity (MW) Commercial Operation Date Solar Roofop
s THB or 118.53% of the Company’s NTA as of September 30, 2017. and more than 3% of net tangible assets. So the Company needs an approval of connected transactions from shareholders’ meeting with the
s THB or 118.53% of the Company’s NTA as of September 30, 2017. and more than 3% of net tangible assets. So the Company needs an approval of connected transactions from shareholders’ meeting with the
Kiat (“Dato’ Marco Low”), to be NDR’s director. In addition, the s THB or 118.53% of the Company’s NTA as of September 30, 2017. and more than 3% of net tangible assets. So the Company needs an approval
Appointment of Product Distributor dated 17 February 2014 between the Company, as Manufacturer, and Mahachai Steel Center, as Distributor 1. Distribution fee at 1.5 percent of total sale of each month for the