structure and sufficient debt capacity. 7. The basis used to determine the value of consideration 7.1 The final bid value of spectrum license is based on the auction identified under the Notification of the
Capacity of Nava Nakorn Electricity Generating Company Limited Nava Nakorn Electricity Generating Company Limited (an indirect joint venture in which Ratchaburi Electricity Generating Company Limited, the
cogeneration power plant project. The power plant has an installed capacity of 121 MW. The project is located in Klongnueng sub-district, Klonglaung district, Pathumthani province. The project has entered into
cycle cogeneration power that commenced COD on October 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The project was able to achieve COD as
December 2017, GLOW had a total installed generating capacity of 3,207 MW of electricity, 1,206 tons per hour of steam, 5,482 cubic meters per hour of processed water and 3,400 refrigerated tons per hour of
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
ABPR5 After the commencement of commercial operation of ABPR3 (with 133 MW installed capacity) in February and ABPR4 (with 133 MW installed capacity) in June, ABPR5 (with 133 installed capacity
scheduled to achieve Commercial Operation Date in January 2018. WHA ESIE 4 water treatment plant achieved COD in January 2018 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500
capacity and took advantage of our increased capacity to maximize production in anticipation of a strong sugar season. The fourth quarter was even stronger than forecasted with volumes up over 30% in