Reclaimed Water Project Phase 2 (RO) at WHA EIE is scheduled to achieve COD in 2Q2019 with capacity of 2,500 cubic meter per day. WHAUP Nghe An Vietnam Project is scheduled to achieve COD in 3Q2019 with
. Significant Events: Reclaimed Water Project (RO) at WHA EIE achieved Commercial Operation Date in July 2018 with capacity of 7,500 cubic meter per day or 2.7 million cubic meter per year. PERFORMANCE BY
Toei District Administrative Organization which is a water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6
water pipe 900 mm. laid on public area, the road behigh the temple Moo.1 Na Toei District, ampher Taymueng, Phanga Province. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023
. Length 350 meter. 6. Permit piping and pressure piping : No.kor.kor.0638/2023/8809 dated December 17, 2015 issued by Department of Highways which is water pipe 900 mm. and pressure pipe in the highways
Road Bangmod Jomthong Bangkok 10150 in total rental area of 4,950 square meter. The term of lease is 3 years starting from August 1st 2018 - July 31st 2021. Transaction Objective : To lease office space
transaction The rental rate is 130 baht per square meter per month. (Only the usable area of the building is 6,594.09 square meters.) or 10,286,780 baht in one year. The rental rate will increase not more than
+, which is the service of Zipmex Pte. Ltd, and gained benefits from digital asset exchange fees. Additionally, such operation of Zipmex had no measure to protect the conflict of interest and to control the
used in the operation of the business, (3) to assess the adequacy and appropriateness of the allowance for inventory, and (4) to review and adjust the data used to measure the fair value of biological
characteristics. - Having the following efficient systems in place: (1) trading system, (2) information and database system with audit trail, (3) market surveillance system, (4) preventive measure against unfair