gross profit margin narrowing to 20% from 26% the previous year. The decrease was due mainly to the impact of a higher cost of goods sold and a change in foreign currency exchange rates. The cost of goods
AUD currency in relative to USD currency, resulting in the decrease of net asset value in AUD currency. In contrast, the Company recorded gain on exchange rate of Baht 233.00 million in the 1 st quarter
progressed 91.58% (The construction plan was 91.70%). The commercial operation date is scheduled in the fourth quarter of 2019. - SBPL Project, a project of San Buenaventura Power Ltd., Co., (EGCO holds a 49
Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 98.78% (The construction plan was 98.30%). The commercial operation date is scheduled
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 91.55% (The construction plan was 91.52%). The commercial operation date is scheduled in the fourth
320.6 million. The increase in core operating profit was mainly due to increased volume and revenue of automotive parts business. Gain on foreign currency exchange rate was at Baht 174.8 million in Q3
. Limited (“VNTH”), its subsidiary in Singapore, and then realized loss on foreign currency differences on dissolution amounting to -13 MB from other comprehensive income to the loss for the year. MTHB % MTHB
: 1) A change in foreign currency exchange rates Table 1: Foreign currency exchange rates and sales in foreign currency 2) A higher cost of main raw materials Table 2: Raw material prices and purchased