located in Mandalay, the Republic of the Union of Myanmar. The first 60MWp of this project will be constructed in late 2020 and the commercial operation date for selling electricity to Ministry of
ownership ? According to TU-PF fund scheme, the fund will invest in the buildings to be constructed on the land owned by the lessor, who would lease the buildings to TU-PF after the construction is completed
Public Company Limited Page 4/5 5.2 The budget for design and construction of shopping center project is worth 200,000,000 baht which will be constructed by the beginning of the second quarter of 2019 6
20.0 mm or 7.8% from the same period of previous year. The main reason was due to higher occupancy rate of Ready-Built factories and warehouses. Gross profit from rental and service of warehouses
institution which follows the performance measurement standards as set out by the Association; (b) at least the following information is presented on the same page: 1. rank, name, or type of awards received; 2
Association; (b) at least the following information is presented on the same page: 1. rank, name, or type of awards received; 2. date, time or the period when the award was granted; 3. name of the institution
performance measurement standards as set out by the Association; (b) at least the following information is presented on the same page: 1. rank, name, or type of awards received; 2. date, time or the period when
the following information is presented on the same page: 1. rank, name, or type of awards received; 2. date, time or the period when the award was granted; 3. name of the institution giving the award or
presented on the same page: 1. rank, name, or type of awards received; 2. date, time or the period when the award was granted; 3. name of the institution giving the award or rank; 4. statement as referred to
which follows the performance measurement standards as set out by the Association; (b) at least the following information is presented on the same page: 1. rank, name, or type of awards received; 2. date