Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
of IRPC Clean Power Phase 2 (IRPC-CP Phase 2) in November 2017, in which GPSC holds 51% equity, has expanded the electricity generating capacity allowing the company to increase the volume of
, increased by Baht 200 million or 28% from Q4/2017. The increase is mainly due to the rise in sales of electricity to Electricity Generating Authority of Thailand (EGAT) as the COD of both phases of IRPC Clean
Unit 6 Co-firing 2050 2030 03 NET ZERO 2050 • Expand green energy capacity • Use 100% clean fuel • Retrofit 100% CCUS • Expand Hydrogen value chain • Expand green energy capacity • Expand alternative
Plants and IRPC Clean Power (IRPC-CP) together with profit realization of Ichinoseki Solar Power 1 GK (ISP1) due to stable weather condition compared to Q1/18 in which there had been heavy snow in Japan
Plants (CUP 1-3) and IRPC Clean Power (IRPC-CP) declined. Additionally, there was a decrease in revenue from Availability Payment (AP) of Sriracha Power Plant due to a lower Weight factor during the rainy
intended to strengthen the capacity, expertise and international competitiveness of financial markets and the funds industry in the region.Implementation ProgressThe participating economies have progressed
the project has progressed 99.84% (The construction plan was 100%). Consequently, the project was completed and its operation started on July 20, 2017. - Banpong Utilities Company Limited, (EGCO holds a
PUBLIC COMPANY LIMITED ABICO HOLDINGS PUBLIC COMPANY LIMITED ABSOLUTE CLEAN ENERGY PUBLIC COMPANY LIMITED ADDTECH HUB PUBLIC COMPANY LIMITED ADVANCED CONNECTION CORPORATION PUBLIC COMPANY LIMITED ADVANCED
Renewable Energy Certificates (REC) concerning its electricity generation output. The construction of the project has progressed 97.99% (The construction plan was 97.46%). The commercial operation date is