) (23.90%) 3 - Construction 343.54 192.48 151.06 78.48% 4 - Testing and Inspection 15.83 16.83 (1.00) (5.94%) 5 Cost of sales and services (494.89) (362.98) 131.91 36.34% Gross Profit 56.52 44.38 12.14 27.35
ratio) 7 : 1 6 : 1 * ) 12 5. KPMG 2564 Big 4 Independence testing 6. KPMG 2564 Big 4 1 13 7. KPMG 2564* Big 4 (Listed company /partner) 22 2.84 * / portfolio allocation 2 108 / KPMG 2564 54
(staff/ partner ratio) 19 : 1 25 : 1 (staff/ manager ratio) 3 : 1 6 : 1 * ) 11 5. EY 2563 - 2564 Big 4 Independence testing 6. EY 2563 Big 4 1 12 7. EY 2563* Big 4 (Listed company /partner) 3.983 2.84
- AQIs 4. * 2565 Non-Big 4 Local firms International firms (staff/ partner ratio) 9 : 1 9 : 1 12 : 1 (staff/ manager ratio) 7 : 1 8 : 1 6 : 1 * ) - 11 - 5. 2565 Non-Big 4 Independence testing 6. 2565 Non
. The SEC may consider an expiry extension to allow greater flexibility for conducting the testing operations. Sandbox participants would be allowed to provide services exclusively to foreign tourists who
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
Turn-key for Engineering, Design, Supply, Installation, Supervision, Testing, Commissioning, etc. Valve, Fire Hose, Fire Extinguisher Equipment, Automatic Sprinkler Equipment Water Base System
. Companies shall determine a sufficient scope of testing to ensure that companies are able to operate according to the BCP correctly and efficiently as expected. 8.2 In testing and assessing the BCP, companies