for safeguarding their user IDs, passwords, and any personal information that may be potentially used to request a change of the user IDs and passwords. 5.4. System and Application Access Control
development of the waste disposal for approximately 15 days at Map Ta Phut facility and the change in the waste treatment procedures at Samaedam facility. These two factors directly affect the delay in some of
December and the fourth quarter of 2019) Performance Analysis Unit : MB Y2019 Y2018 Change MB % Net sales 1,001.58 1,057.38 (55.80) (5.28) Other income 41.40 47.74 (6.34) (13.28) Total revenues 1,042.98
was 0.96 times which reflect a capability for the Company to acquire more bad debt in the future. Summary of Revenues and Net Profit Q1/2017 Q1/2018 Change MB. % MB. % MB. % Services income from debts
Unit : MB For the period ended Change 31 March 2020 31 March 2019 MB % Net sales 195.84 238.99 (43.15) (18.06) Revenue from services 2.05 - 2.05 100.00 Other income 10.32 9.49 0.83 8.77 Total revenues
than loans, liquidity in the commercial banking system increased from the end of last year. Meanwhile, loan quality, measured by the ratio of non-performing loans (NPLs) to total loans, continued to
scheduled to be upgraded within 3 years. B.Grimm signed MOU with LGChem for the development in energy storage system and with PetroVietnam Power Corporation-JSC to jointly study and develop power plants with
Thailand remained stable. Capital funds and reserves were at a high level and were able to support the challenges of uncertain economic conditions. The performance of the Thai banking system improved, mainly
on track Interchem, the waste-to-energy project, with an installed capacity of 4.8 MW had 86.64% current construction progress which is on process of drainage system piping, double layer brick wall and
of pilling work and grounding system. The project has the scheduled COD by December 2019. B.GRIMM POWER PUBLIC COMPANY LIMITED Management’s Discussion and Analysis KEY FINANCIAL HIGHLIGHT Sales and