the PPA with EGAT for 25 years with the contracted capacity of 90 MW. Additionally, the project has the 7 years contract with industrial user to sell 12 MW of electricity along with 13 tonnes per hour
power plant project, Run-of-River. The project is located in the Laos People’s Democratic Republic (Laos PDR). The project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 94.37% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 96.36% (The
with EGAT with the contracted capacity of 1,220 MW and Electricite Du Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has progressed 99.40% (The
maintenance in 1Q2017 and higher energy payment which is from higher power dispatch to EGAT in 1Q2018. The increase is also from higher coal price. - Five SPPs (Gulf VTP, Gulf TS1, Gulf TS2, Gulf TS3 and Gulf
transmission and telecommunication tower decreased by 34.91% YoY being impacted by the COVID- 19 outbreak and inspection rescheduling by EGAT. However, the remaining order was completely inspected and delivered
project has entered into the PPA with EGAT with the contracted capacity of 1,220 MW and Electricite De Laos (EDL) with the contracted capacity of 60 MW for 29 years. The construction of the project has
price. By the way, the Group has been compensated the increased in gas price from EGAT in form of adjusted electricity price to be in line with natural gas price. Gross Profit and Gross Profit Margin 2019
) has been applied to GHECO-One which resulted Gheco-One to levelize the AP over the contract period rather than the front-loaded AP received from EGAT according to PPA and to record the deferred revenue