Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
Rayong and Chonburi Provinces. GLOW also owns a hydroelectric plant in Attapeu Province in Lao People's Democratic Republic (Lao PDR). As of 31 December 2017, GLOW had a total installed generating capacity
ABPR5 After the commencement of commercial operation of ABPR3 (with 133 MW installed capacity) in February and ABPR4 (with 133 MW installed capacity) in June, ABPR5 (with 133 installed capacity
scheduled to achieve Commercial Operation Date in January 2018. WHA ESIE 4 water treatment plant achieved COD in January 2018 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500
capacity and took advantage of our increased capacity to maximize production in anticipation of a strong sugar season. The fourth quarter was even stronger than forecasted with volumes up over 30% in
Efficiency Report, ESMA Energy Renewable Capacity Installed renewable energy capacity in GW or % (consolidated) 7 Climate Change Mitigation IEA World Energy Outlook IRENA, RE100 Energy - % of renewable
stage of production; therefore, the production is unable to operate at its full capacity. Moreover, an increase in prices of sugar and garlics, which are the main raw materials used in the production, has
year 2016 ECF Holdings Company Limited, as the subsidiary of the Company by holding 75 percent of total shares, invested to solar power plant with installation capacity 1.5 MW at Himeji Prefecture, Japan
biomass power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of tota l shares by SAFE. The Company could start
power plant project with installation capacity 7.5 MW of Prize of Wood Green Energy in Narathiwat Province which this project is held 99.99 percent of total shares by SAFE. The Company could start gaining