price, totaling THB 1.96 million to Gulf Energy Development Public Company Limited. The project is a combined-cycle power plant project that used natural gas as the main fuel with total contracted
business is construction work which has all scope of work on Engineering drawing, Procurement machine and equipment, and Construction management to serve all client requirement in every construction process
process. The principal business operaton of the Group are summarized in 4 categories as follow; 1. EPC Serive such Engineering, Procurement, Construction, and Construction management, 2. Structural
of 14.73 million baht, the decreased loss of 8.53 million or decreased loss percentages of 57.91% , the main reasons are as follow; 1. Revenue from sale , Other income The company had sale revenue at
decrease rate of 10.16 percent. The revenue decrease was caused by the high competition in the battery industry resulting in the deceleration in domestic sales. Moreover, lead which is the main raw material
Green Bond Principles Voluntary Process Guidelines for Issuing Green Bonds June 2021 Introduction The Green Bond Principles (GBP), together with the Social Bond Principles (SBP), the Sustainability
bidding process. The main reasons in which hindered the Company from securing the construction bidding contracts remain from two factors as follows; (1) The increase in cost of construction mainly prices of
. Complaints under the process of the court’s consideration or cases having reached final judgments. 3. Repeated complaints of the same matters that have already been clarified by the SEC, without new
171 million Baht. The main reason is the effect from the gain of control in 2 | P a g e Pace Development Corporation Public Company Limited 87/2 CRC Tower All Seasons Place, 45th Floor, Unit 3, Wireless
services in line with IT-related service policy and acceptable risk appetite. KBank is in the process of establishing relevant policies and operational procedures as well as investment and income ratio of IT