gas-fired combined cycle cogeneration power that commenced COD on February 1, 2018. It has an installed capacity of 133 MW and sells electricity to EGAT 90 MW under a 25-year PPA. The Project was able
approximately AUD 10 million. It is expected to commence commercial operation within December 2018. 1.1.3 Riau Combined-Cycle Power Plant Project in the Republic of Indonesia On April 7, 2017, RH International
(English translation) No. BGRIM 17/2563 17 September 2020 Subject: Information Memorandum on Asset Acquisition from Investment in the Development of 7 Combined Cycle Cogeneration Plants To: President
inspection results in the 3 inspection cycle (2017-2018); the score in each element of the quality control system of most audit firms was higher than that during the 2 cycle, notably the ‘monitoring’ element
year 2018 of THB 27 mil., +308% when compared same period of last year regarding to TBSP consolidation and extra finance cost from additional long-term loan for Tender Offer in TBSP. Excluding the extra
2,954mn, an increase of 74.2% YoY. The growth was mainly driven by 1) the full-year consolidation of the System Integration segment through Trans.Ad Group and 2) the 5-month consolidation of International
Analysis for the period 3 months June 30, 2017 as follows:- Million Baht By Consolidation method The Company Q2/17 Q2/16 Q2/Different Q2/17 Q2/16 Q2/Different Sales and service income 1,037 856 181 21% 907
% 18.5% Adjusted net profit margin 20.3% 23.2% 24.5% Note: The Company restated its 3Q 2016/17 financial performance after the consolidation of Rabbit Group under the common control basis. 1Adjusted for
converting their operating results from local currencies to Thai Baht for the consolidation of financial statements. The manufacturing and selling of Toolings and Metal Fabrications, which is solely from
(22.0) Current investments 2 223 (99.2) Trade and other receivables 11,480 11,558 (0.7) Inventories 10,003 9,461 5.7 Investments in associated companies 506 536 (5.6) Consolidation goodwill 425 438 (3.0