, higher repair and maintenance expenditure of medical equipment, and higher depreciation and amortization expenses resulted from the expansions of a new hospital and new specialized centers in the existing
, resulting in higher revenue recognition together with the increase electricity sales volume corresponding to EGAT’s dispatch instruction and the decrease in maintenance cost as a result of the expiration of
rental and service was Baht 135.80 million, a decrease of Baht 24.41 million or down by 15.24% as a result of lower utility costs, depreciation expense, maintenance cost, and outsourced labor cost of space
. KYE need a replacement new air conditioners for reduce the breakdown time, saving maintenance cost, saving energy. New air conditioners system expanding from the current air conditioners system for
. KYE need a replacement new air conditioners for reduce the breakdown time, saving maintenance cost, saving energy. New air conditioners system expanding from the current air conditioners system for
and amortisation cost 111.3 107.1 4.2 3.9 Staff cost and other benefits 27.7 30.2 (2.5) (8.3) Repair and maintenance cost 27.1 40.0 (12.9) (32.3) Engineering and other services 21.5 19.4 2.1 10.8
and amortisation cost 111.3 107.1 4.2 3.9 Staff cost and other benefits 27.7 30.2 (2.5) (8.3) Repair and maintenance cost 27.1 40.0 (12.9) (32.3) Engineering and other services 21.5 19.4 2.1 10.8
reserved shutdown following EGAT dispatch instruction, the reserved shutdown had allowed the plant to reduce the hourly maintenance cost making the gross profit increase by 7% from 2016. However, at the same
) Depreciation and amortization cost 106.3 105.8 108.1 109.3 1.2 1.1 429.5 432.4 (2.9) (0.7) Staff cost and other benefits 41.0 43.9 37.9 38.9 1.0 2.6 161.7 153.2 8.5 5.5 Repair and Maintenance cost 48.6 24.9 32.5
37.9 4.6 40.1 4.5 122.8 4.9 113.7 4.5 Repair and Maintenance cost 32.7 4.0 39.7 4.4 106.2 4.2 128.7 5.1 Other cost 26.0 3.2 39.5 4.5 81.6 3.2 110.2 4.4 Total cost of Biomass Power Plants 408.3 49.8 497.1