expected useful life of Buildings, Plant Machinery and equipment is according to the Company’s consideration and review of depreciation in the past by collecting and analyzing information related to the
enhance the capability to develop new products to catch up with the technology changing and the dynamic marketing. Operating profit in Q1-19 totaling Baht 979 million or Baht 71 million down from the same
means short-term investments with high liquidity ready to be converted into definite amounts of cash, and low risk of value changing or pertaining insignificant value changing, most of which are bills or
high liquidity ready to be converted into definite amounts of cash, and low risk of value changing or pertaining insignificant value changing, most of which are bills or promissory notes issued, accepted
short-term investments with high liquidity ready to be converted into definite amounts of cash, and low risk of value changing or pertaining insignificant value changing, most of which are bills or
January 2024 is eligible if it has either: • A power density > 5W/m2 OR • GHG emissions intensity < 100g CO2e/kWh during the life cycle of the powerplant. A hydropower facility commencing operation on 1
revised expected useful life of Buildings, Plant Machinery and equipment is according to the Company’s consideration and review of depreciation in the past by collecting and analyzing information related to
>= 25%; AND • Bottom ash recovery; AND • >= 90% recovery of metal from ash; AND • Average carbon intensity of electricity and/ or heat over the life of the plant
consisting of current assets at 80.33%, Property, plant and equipment at 16.39% and other assets at 3.27% when compared to the year 2017, which was decreased by 15.34 million baht or 3.19%. The main changing
& ANALYSIS (MD&A) Q4 2019 and FY2019 Operating performance by plant in Q4 2019 The company’s gross profit was at Baht 4,682 million in Q4/2019 which decreased by Baht 794 million or 14% from Q3/2019 and i