income from Ratchaburi Power Company Limited (RPCL) amounting Baht 150 million and income from the contractor of IRPC-CP Phase 1 that the company received in Q3/2017. However, EBIT for Q4/2017 had
Plants (CUP 1-3) and IRPC Clean Power (IRPC-CP) declined. Additionally, there was a decrease in revenue from Availability Payment (AP) of Sriracha Power Plant due to a lower Weight factor during the rainy
Authority of Thailand (EGAT) because of the reserved shutdown following EGAT dispatch instruction; IRPC Clean Power Phase 1 (IRPC-CP Phase 1) ceased the gas turbine generator to commissioning with Phase 2 in
income from RPCL, with no machines compensation of Rayong Central Utility Plant 1 (CUP-1) and the compensation from the contractor of IRPC-CP Phase 1 as in 2017. Gain or Loss from the Exchange Rate In Q4
income from RPCL, with no machines compensation of Rayong Central Utility Plant 1 (CUP-1) and the compensation from the contractor of IRPC-CP Phase 1 as in 2017. Gain or Loss from the Exchange Rate In Q4
Plants and IRPC Clean Power (IRPC-CP) together with profit realization of Ichinoseki Solar Power 1 GK (ISP1) due to stable weather condition compared to Q1/18 in which there had been heavy snow in Japan
Power (IRPC-CP Phase 1 and Phase 2) in November 2017, in which GPSC holds 51% equity, allowed the company to expand the electricity generating capacity resulting in an increase in volume of electricity
) CP Fresh Mart Phetchaburi 38/1 (Sukhumvit 39), and 10) Veggiology, collecting two types of cleaned plastic waste: stretch plastics and hard plastics. There was also a point collection for rewards
Clean Power Phase 1 (IRPC-CP Phase 1): The revenue in Q2/2017 increased by 43% due to a major industrial customer resumed its normal operation from a maintenance in Q1/2017, resulting in Baht 62 million
PowerPoint Presentation MANAGEMENT DISCUSSION & ANALYSIS THE INNOVATIVE POWER FLAGSHIP OF PTT GROUP MD&A Q1/2019 PAGE 1 MANAGEMENT DISCUSSION & ANALYSIS (MD&A) Q1 2019 For Q1/2019, the EBITDA of the