treatment plant 12,000 cubic meter per day and wastewater treatment plant 9,600 cuber meter per day. Power In 2018, Solar Rooftop had 11.2 MW signed which are under construction and scheduled to achieve
. WHA ESIE 4 is scheduled to achieve COD in 2019 with capacity of water treatment plant 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day Power Solar Rooftop with a
of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. Power In 1Q2019, Solar Rooftop had signed new 5.0 MW, total accumulated capacity in pipe line are 14.3 MW which
project phase 2 at WHA EIE is scheduled to achieve COD in 4Q2020 with contractual capacity of 4,400 cubic meter per day. Power In 2Q2020, Solar Rooftop had signed new 7.2 MW, total accumulated capacity in
ESIE 3 water treatment plant is scheduled to achieve COD in 4Q2019 with capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. Power In 2Q2019, Solar Rooftop
capacity of 3,600 cubic meter per day and wastewater treatment plant 1,500 cuber meter per day. Power In 3Q2019, Solar Rooftop had signed new 3.1 MW, total accumulated capacity in pipe line are 19.9 MW
with capacity of 5,200 cubic meter per day. Demineralized Water project phase 2 at WHA EIE is scheduled to achieve COD in 3Q2020 with capacity of 4,400 cubic meter per day. Power In 1Q2020, Solar
plant 1,500 cuber meter per day. WHAUP Nghe An Vietnam water treatment plant is scheduled to achieve COD in 3Q2020 with capactity of 9,600 cubic meter per day. Power In 4Q2019, Solar Rooftop had
treatment plant is scheduled to achieve COD in 3Q2020 with capactity of 9,600 cubic meter per day. Power In 4Q2019, Solar Rooftop had signed new 4.0 MW, total accumulated capacity in pipe line are 24.4 MW
attributable to Owners of the Parent 295.9 700.8 (57.8%) 1,012.1 973.3 4.0% Foreign Exchange Gain (Loss) (315.3) 98.9 (418.8%) (64.7) 338.9 (119.1%) Normalized Profit attributable to Owners of the Parent 611.2